- Jed
I think as a practical matter the only generating capacity that can be
installed quickly is the aeroderivative natural gas turbine type. This
is also cost effective and it produces relatively little CO2 per kWh of
electricity. Japan has a great deal of privately owned generator and
co-gen capacity which is fed into the national grid. I think it is
mostly of this type.
- [Vo]:Prediction of a winner Jones Beene
- Re: [Vo]:Prediction of a winner OrionWorks - Steven V Johnson
- Re: [Vo]:Prediction of a winner Terry Blanton
- RE: [Vo]:Prediction of a winner Jones Beene
- Re: [Vo]:Prediction of a winner Jed Rothwell

