It seems to me that all the chatter about the 350 day term of Rossi’s test is 
just so much babble from armchair dilletantes. It is tantamount to trolling. I 
for one have no end of admiration for Rossi in performing his test so 
diligently and as openly as he has done. In the face of the nasty trolls that 
he seems to have attracted one thing is clear this guy is no shrinking coward. 
Of course his real test comes with making some report of the test public and of 
its effect in the real world. 

 

From: Mats Lewan [mailto:[email protected]] 
Sent: Sunday, February 21, 2016 8:09 AM
To: [email protected]
Subject: Re: [Vo]:the expected LENR Surprise Rossi's long time test over!Re:

 

Jed,

I would expect the 350-day term to be a condition in some kind of agreement, 
e.g. something between IH and Rossi.

To me it looks like a condition set up by managers, not engineers, who want to 
find a water proof condition for making sure the technology is valid, not only 
for themselves but also for convincing customers and the public. Thus not for 
convincing engineers only. 

In this sense, from an engineering perspective, you could say the story is 
incomplete. 

 

I also think you should make a distinction between the Lugano report and this 
one. 

The Lugano report were produced by academics, whereas I expect this one to be 
produced by experienced industrial experts/engineers. 

A part from taking some time to analyse all data and produce a report according 
to internal standards for the certifying institute, whichever it is, I guess 
there’s also the issue that IH, Rossi and the client have to agree on what to 
report to the public, and when. 

 

So even though I have reported that sources say the result was successful, I 
know nothing of the evaluation the third party is doing, and it could of course 
be different.  

 

Mats

www.animpossibleinvention.com <http://www.animpossibleinvention.com> 

 

 

 

On 21 Feb 2016, at 04:29, Jed Rothwell <[email protected] 
<mailto:[email protected]> > wrote:

 

<[email protected] <mailto:[email protected]> > wrote:

 

That may be true of normal commercial equipment that has already had the
teething problems removed, and where one may expect consistent action. However
that is not likely to be the case with Rossi's reactor.

 

If it works for an hour, any HVAC engineer could confirm that. Or if it is not 
working that particular hour, the equipment would show that, too. The whole 
purpose of HVAC test equipment is to sort out whether the machine is working 
consistently or not. Things stop working in an ordinary HVAC installation. 
Baffles get stuck; fans turn off. It often happens at my office. That's why the 
guy comes around with his air flow vane velocity fan and thermometer.

 

I am just saying the story is incomplete. This cannot mean a "test" in the 
normal sense of the word, because people test heaters a hundred thousand times 
a day, and these tests take an hour.

 

 

He was baby-sitting it for the year, and fixing things whenever it broke down.

 

If it is broken that day, the HVAC guy comes back the next day. My point is, 
you can confirm it is working in less than a year.

 

 

The customer needed to know that it would pay off in
the long term. Hence the year long test.

 

If so, I could have saved the customer the trouble. No, it is not possible this 
thing can work trouble free for a year. And even if it could, the machine would 
be obsolete long before that. Rossi demonstrated that when kept describing new 
configurations and new gadgets during the test.

Prototypes are never stable in performance. They are obsolete in months. Even 
first-generation production devices are soon obsolete, and seldom on the market 
for a year. Frederick Brooks described prototypes in his book "The Mythical Man 
Month", in the chapter "plan to throw one away:"

In most projects, the first system built is barely usable. It may be too slow, 
too big, awkward to use, or all three. There is no alternative but to start 
again, smarting but smarter, and build a redesigned version in which these 
problems are solved. The discard and redesign may be done in one lump, or it 
may be done piece-by-piece. But all large-system experience shows that it will 
be done. Where a new system concept or new technology is used, one has to build 
a system to throw away, for even the best planning is not so omniscient as to 
get it right the first time

 

The management question, therefore, is not whether to build a pilot system and 
throw it away. You will do that. The only question is whether to plan in 
advance to build a throwaway, or to promise to deliver the throwaway to 
customers. Seen this way, the answer is much clearer. . . .

 

- Jed

 

 

Reply via email to