On 6/18/2019 10:11 AM, Reuti wrote:
Am 18.06.2019 um 15:47 schrieb David Trimboli<trimb...@cshl.edu>:
I know qmon is deprecated and all that, but I was just wondering if someone
could tell me where to customize the number of finished jobs visible in Job
Control | Finished Jobs.
Inside `qmon` it's "Cluster Configuration" the entry "global" => "Modify" and then in "General
Settings" in the top right location "Finished Jobs".
But it won't retrieve jobs which were already drained from the listing. Also
after a restart of the `qmaster`, the list will initially be empty.
Awesome, thanks! I didn't realize that was a setting that comes from
global configuration; I was looking in the GUI config file.
_______________________________________________
users mailing list
users@gridengine.org
https://gridengine.org/mailman/listinfo/users