Hi Rafa,

for such purposes we have configured a separate Parallel Environment with 
"allocation_rule" "$pe_slots" (instead of "$fill_up"). Jobs scheduled with this 
rule can run ONLY on one host.

Regards,
Usula

-----Ursprüngliche Nachricht-----
Von: users-boun...@gridengine.org [mailto:users-boun...@gridengine.org] Im 
Auftrag von Rafael Arco Arredondo
Gesendet: Donnerstag, 18. September 2014 09:44
An: users@gridengine.org
Betreff: [gridengine users] Hosts not fully used with fill up

Hello everyone,

We are having an issue with the parallel environments and the allocation of 
slots with the fill up policy.

Although we have configured the resource quotas of the queues not to use more 
than the number of slots the machine have and we control in the prolog that the 
jobs be submitted with a number of slots multiple of the number of physical 
processors, we are observing that sometimes, the slots of a job are split into 
several nodes, when they should be running in only one node.

We are using Open Grid Scheduler 2011.11p1. This didn't happen in SGE 6.2.

Has anyone experienced the same situation? Any clues of why it is happening?

Thanks in advance,

Rafa

_______________________________________________
users mailing list
users@gridengine.org
https://gridengine.org/mailman/listinfo/users

_______________________________________________
users mailing list
users@gridengine.org
https://gridengine.org/mailman/listinfo/users

Reply via email to