Is it possible to trigger a window without changing window-start and window-end dates?
I have a lot of jobs run in window tumble (3H) and when they are all triggered at the same time, it causes performance problems. If somehow I can delay some of them 10-15 minutes , without changing the original data in the window and window-start, window-end dates, it would be great. Thanks Kenan