Hi Aitozi, The current connection sharing is only suitbale for the same jobVertex between TaskMangaers via ConnectionIndex. I ever tried to remove this limit by ticket [1] but have not reached an agreement on this. You could watch this jira if interested.
[1] https://issues.apache.org/jira/browse/FLINK-10462 Best, Zhijiang ------------------------------------------------------------------ From:aitozi <gjying1...@gmail.com> Send Time:2019年6月16日(星期日) 22:19 To:user <user@flink.apache.org> Subject:A little doubt about the blog A Deep To Flink's NetworkStack Hi, community I read this blog A Deep To Flink's NetworkStack <https://flink.apache.org/2019/06/05/flink-network-stack.html> In the chapter *Physical Transport*, it says that the /if different subtasks of the same task are scheduled onto the same TaskManager, their network connections towards the same TaskManagers will be multiplexed and share a single TCP channel for reduced resource usage./. But I check the code I think each taskmanager have a NettyServer and a NettyClient which work with a channel. So i think the tcp channel is shared between the taskmanager remote connection no matter there is different subtasks of the same task are scheduled onto the same TaskManager or not. Please correct me if my thoughts was wrong. Thanks Aitozi -- Sent from: http://apache-flink-user-mailing-list-archive.2336050.n4.nabble.com/