Hi all,

On a test setup I a looking to do an upgrade from 4.0.3 to 4.0.6.

Would one typically snapshot before DRAIN or after?

If DRAIN after snapshot, I would have to restart the service to snapshot and 
would this not then be accepting new operations/data?

If DRAIN before snapshot, would there be the possibility of not having the most 
current situation?  I realise that the latter option would render any changes 
fairly negligible even in a live environment.

Apologies if these questions seem redundant.  Apache documentation is not as 
comprehensive as it seems to be for (EG) HBASE.

Thanks

M

Reply via email to