Hello Alexis, thanks for writing down the summary, and the initial adjustments after our PMs. Sorry for responding so late, this slipped through the cracks :(
In general this seems fine to me, I just have two questions: Alexis Bruemmer [2014-06-26 13:00 -0700]: > It is critical that the state server and agents be kept in sync, and both > of these sets of machines are created, booted, and managed by Juju. Out of interest, how is that enforced? If you dist-upgrade one VM but not the other, will bad things happen? Or should that be worded differently? > Tests are required for all changes, each change must be signed off by two > Juju developers and have a specific QA review, and a variety of fresh > install and upgrade combinations must be explicitly tested on every cloud > that Juju supports (for details see the “Testing a revision” section of the > Juju CI Design and Operation document linked below) This really seems to be the crux of regression testing as far as SRUs and existing cloud deployments are concerned. Whenever I try to open the google docs I just get a "File unavailable. Sorry, there's a problem with this file. Please reload.", so I can't look at the details. Does that mean that newer clients are tested on existing deployments with older servers and agents? Which combinations does that cover? Thanks, Martin -- Martin Pitt | http://www.piware.de Ubuntu Developer (www.ubuntu.com) | Debian Developer (www.debian.org) -- technical-board mailing list technical-board@lists.ubuntu.com https://lists.ubuntu.com/mailman/listinfo/technical-board