On Sun, Oct 25, 2015 at 10:20:10AM +0000, Gerd Petermann wrote:
> I don't think that this is a strong point.
> Thinking about my own edits I'd say that the
> length could be +/- 4m because typically I just try to place
> the nodes somewhere neer the road, if I find an existing
> node that looks good enough I use that.
>  On the other hand, I think we make 
> assumptions about the width of the road based on its 
> type (primary, secondary ,etc),
> so this assumption would also apply on the culvert.

So we implicitly assume a width of a road now we propagate
this fault to all attached objects? 

We should reduce errors by implicitly assuming something not
increase them.

Flo
-- 
Florian Lohoff                                                 f...@zz.de
      We need to self-defend - GnuPG/PGP enable your email today!

Attachment: signature.asc
Description: Digital signature

_______________________________________________
Tagging mailing list
Tagging@openstreetmap.org
https://lists.openstreetmap.org/listinfo/tagging

Reply via email to