Author: roberto
Date: Sun Aug 25 14:29:47 2013
New Revision: 254859
URL: http://svnweb.freebsd.org/changeset/base/254859

Log:
  MFC r226840: AESNI-related commit, from a long time ago:
  
  Before this change when GELI detected hardware crypto acceleration it will
  start only one worker thread. For software crypto it will start by default
  N worker threads where N is the number of available CPUs.
  
  This is not optimal if hardware crypto is AES-NI, which uses CPU for AES
  calculations.
  
  Change that to always start one worker thread for every available CPU.
  Number of worker threads per GELI provider can be easly reduced with
  kern.geom.eli.threads sysctl/tunable and even for software crypto it
  should be reduced when using more providers.
  
  While here, when number of threads exceeds number of CPUs avilable don't
  reduce this number, assume the user knows what he is doing.
  
  Submitted by: Michael Moll <kved...@kvedulv.de>

Modified:
  stable/9/sys/geom/eli/g_eli.c
  stable/9/sys/geom/eli/g_eli.h
Directory Properties:
  stable/9/sys/   (props changed)

Modified: stable/9/sys/geom/eli/g_eli.c
==============================================================================
--- stable/9/sys/geom/eli/g_eli.c       Sun Aug 25 14:27:14 2013        
(r254858)
+++ stable/9/sys/geom/eli/g_eli.c       Sun Aug 25 14:29:47 2013        
(r254859)
@@ -444,16 +444,15 @@ g_eli_worker(void *arg)
        sc = wr->w_softc;
 #ifdef SMP
        /* Before sched_bind() to a CPU, wait for all CPUs to go on-line. */
-       if (mp_ncpus > 1 && sc->sc_crypto == G_ELI_CRYPTO_SW &&
-           g_eli_threads == 0) {
+       if (sc->sc_cpubind) {
                while (!smp_started)
                        tsleep(wr, 0, "geli:smp", hz / 4);
        }
 #endif
        thread_lock(curthread);
        sched_prio(curthread, PUSER);
-       if (sc->sc_crypto == G_ELI_CRYPTO_SW && g_eli_threads == 0)
-               sched_bind(curthread, wr->w_number);
+       if (sc->sc_cpubind)
+               sched_bind(curthread, wr->w_number % mp_ncpus);
        thread_unlock(curthread);
 
        G_ELI_DEBUG(1, "Thread %s started.", curthread->td_proc->p_comm);
@@ -810,11 +809,7 @@ g_eli_create(struct gctl_req *req, struc
        threads = g_eli_threads;
        if (threads == 0)
                threads = mp_ncpus;
-       else if (threads > mp_ncpus) {
-               /* There is really no need for too many worker threads. */
-               threads = mp_ncpus;
-               G_ELI_DEBUG(0, "Reducing number of threads to %u.", threads);
-       }
+       sc->sc_cpubind = (mp_ncpus > 1 && threads == mp_ncpus);
        for (i = 0; i < threads; i++) {
                if (g_eli_cpu_is_disabled(i)) {
                        G_ELI_DEBUG(1, "%s: CPU %u disabled, skipping.",
@@ -854,9 +849,6 @@ g_eli_create(struct gctl_req *req, struc
                        goto failed;
                }
                LIST_INSERT_HEAD(&sc->sc_workers, wr, w_next);
-               /* If we have hardware support, one thread is enough. */
-               if (sc->sc_crypto == G_ELI_CRYPTO_HW)
-                       break;
        }
 
        /*

Modified: stable/9/sys/geom/eli/g_eli.h
==============================================================================
--- stable/9/sys/geom/eli/g_eli.h       Sun Aug 25 14:27:14 2013        
(r254858)
+++ stable/9/sys/geom/eli/g_eli.h       Sun Aug 25 14:29:47 2013        
(r254859)
@@ -190,6 +190,7 @@ struct g_eli_softc {
        size_t           sc_sectorsize;
        u_int            sc_bytes_per_sector;
        u_int            sc_data_per_sector;
+       boolean_t        sc_cpubind;
 
        /* Only for software cryptography. */
        struct bio_queue_head sc_queue;
_______________________________________________
svn-src-all@freebsd.org mailing list
http://lists.freebsd.org/mailman/listinfo/svn-src-all
To unsubscribe, send any mail to "svn-src-all-unsubscr...@freebsd.org"

Reply via email to