I have a shed roof on an apartment building protected by CPVC pipe.  The shed 
roof has a 3:12 pitch.  The only special application head that meets the slope 
and configuration requirement is the TY3190.

The heads' data sheet does not show a shed roof configuration, it only shows 
them being used in a hip, and in conjunction with BB's or SD's.

The attic space is wood-framed and it will be a dry system.  Has anyone used 
these heads by themselves, not in conjunction with the BB or SD heads?  If I 
follow the spacing guidelines from the other diagrams, how many heads would I 
calculate?  I'm thinking (7) would be fine.

I've reached out to Johnson Controls, however, I thought I would get some other 
people's opinion and advice.

Thank you.


Jeff Brickell, CET
NICET III CERTIFIED
CERT #147245

OREGON CERTIFIED COBID FIRM #13272
(EMERGING SMALL BUSINESS)

TRIAD FIRE PROTECTION
[cid:[email protected]]
OREGON . WASHINGTON . ARIZONA

OFFICE  503.856.6333
CELL       602.550.4292
FAX        866.766.8862

_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to [email protected]

Reply via email to