We have a project with standpipes and a basement. All floors above the basement drain through the Standpipe drain and empty at grade. We usually then drain the remaining (basement) section of standpipe through the bottom hose valve. The GC is asking if we can instead drain that last section by tying into the roof drain in the same stairwell that runs outside below grade. Is this a no-no?