So I have a 13D residential project with a 12:12 pitch, beamed ceiling
configuration. In the last beam pocket area there is a fireplace located
below. It's literally impossible to place a sprinkler far enough away from
the fire place per 13D's required spacing for both the ordinary or
intermediate temperature sprinklers without violating the requirement to be
within 36" vertically down from the peak. So it would seem I have to
violate something in order to get this to work. I can either use a quick
response 286F sprinkler which should cover the temperature issue but
violate 13D's use of quick response sprinklers which only allows for very
limited usage of such. Or I can violate the 36" down from peak requirement
and use residential sprinklers for that bay. At least that's the way I see
it.

Any recommendations on how to address this?

Best Regards,
Anthony Johnson
Mountain Fire Protection
'Saving Lives and Valuing Property'


<http://www.avg.com/email-signature?utm_medium=email&utm_source=link&utm_campaign=sig-email&utm_content=webmail>
Virus-free.www.avg.com
<http://www.avg.com/email-signature?utm_medium=email&utm_source=link&utm_campaign=sig-email&utm_content=webmail>
<#DAB4FAD8-2DD7-40BB-A1B8-4E2AA1F9FDF2>
_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to [email protected]

Reply via email to