Patches to mass-check which do this threading stuff (remember perl threads are
uber-flakey) will be happily accepted (provided that they work!).

C

Daniel Quinlan wrote:

DQ> If the non-local network tests take too long, how about running all of
DQ> them first in a separate thread, then do the local tests while that's
DQ> happening, and when the local tests are done, collect the results from
DQ> the network tests?
DQ>
DQ> The overall idea is to run IO-bound tests at the same time you are
DQ> running CPU-bound tests.


_______________________________________________________________

Don't miss the 2002 Sprint PCS Application Developer's Conference
August 25-28 in Las Vegas -- http://devcon.sprintpcs.com/adp/index.cfm

_______________________________________________
Spamassassin-talk mailing list
[EMAIL PROTECTED]
https://lists.sourceforge.net/lists/listinfo/spamassassin-talk

Reply via email to