Hi Chris, thank you for the reply. The team that manages that cluster is not very fond of upgrading SLURM, which I understand. So basically my heterogeneous job that only have one step is considered to have multiple steps and that's a bug in SLURM 17.11.12 ?
Le mer. 20 mars 2019 à 07:02, Chris Samuel <ch...@csamuel.org> a écrit : > On Tuesday, 19 March 2019 2:03:27 PM PDT Frava wrote: > > > I'm struggling to get an heterogeneous job to run... > > The SLURM version installed on the cluster is 17.11.12 > > Your Slurm is too old for this to work, you'll need to upgrade to 18.08. > I believe you can enable them with "enable_hetero_steps" option in your > scheduler parameters, but even then I don't believe it's working properly > there. > > All the best, > Chris > -- > Chris Samuel : http://www.csamuel.org/ : Berkeley, CA, USA > > > > >