HI Doug,

Thanks for your suggestion.  Investigating the slurmd logs uncovered a DNS
issue.  We fixed that and it resolved the problem.

Thanks,

Howard

--
Howard Pritchard
HPC-DES
Los Alamos National Laboratory


From: Douglas Jacobsen <[email protected]<mailto:[email protected]>>
Reply-To: slurm-dev <[email protected]<mailto:[email protected]>>
Date: Wednesday, January 11, 2017 at 12:29 PM
To: slurm-dev <[email protected]<mailto:[email protected]>>
Subject: [slurm-dev] Re: srun job launch time issue


Are these sruns already in an allocation or not?  If not, you might consider 
setting PrologFlags=alloc in slurm.conf, which should perform much of the 
remote job setup when the head node is configured (presuming that might be your 
issue, or you have a configuration that might make that an issue).  Otherwise, 
checking slurmd logs (ideally with debug level logging) on the different nodes 
may give a clue.

-Doug

On 1/11/17 11:23 AM, Pritchard Jr., Howard wrote:
Hi SLURM folks,

I recently got SLURM (16.05.6) set up on a small cluster (48 nodes x86_64 + 
Intel OPA)
and things appear to be nominal except for one odd performance problem
as far as srun launch times go.  I don’t observe this on other clusters running
SLURM at our site.

What I’m observing is that regardless of whether or not the application being
launched is a command (e.g. /bin/hostname) or an MPI application, I get 
reasonable
job launch times when using one node, but as soon as I use two or morenodes, 
there
is about a 10 second overhead to get the processes on the additional nodes 
started:

For example:


[hpp@hi-master ~]$ srun -n 8 -N 1 date

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017

Wed Jan 11 12:11:29 MST 2017


[hpp@hi-master ~]$ srun -n 8 -N 2 date

Wed Jan 11 12:10:35 MST 2017

Wed Jan 11 12:10:35 MST 2017

Wed Jan 11 12:10:35 MST 2017

Wed Jan 11 12:10:35 MST 2017

Wed Jan 11 12:10:44 MST 2017

Wed Jan 11 12:10:44 MST 2017

Wed Jan 11 12:10:44 MST 2017

Wed Jan 11 12:10:44 MST 2017


[hpp@hi-master ~]$ srun -n 8 -N 4 date

Wed Jan 11 12:10:57 MST 2017

Wed Jan 11 12:10:57 MST 2017

Wed Jan 11 12:11:07 MST 2017

Wed Jan 11 12:11:06 MST 2017

Wed Jan 11 12:11:07 MST 2017

Wed Jan 11 12:11:06 MST 2017

Wed Jan 11 12:11:07 MST 2017

Wed Jan 11 12:11:07 MST 2017


Anyone observed this problem before?


Any suggestions on how to resolve this problem would be much

appreciated.


Thanks,


Howard


--
Howard Pritchard
HPC-DES
Los Alamos National Laboratory


Reply via email to