Am 13.09.2017 um 19:15 schrieb Jackson, Gary L.:

> 
> I’d like to run multithreaded jobs on a cluster that has previously been used 
> exclusively for serial jobs. The problem is that serial jobs are bypassing 
> the parallel jobs despite the parallel jobs having higher priority. Since an 
> entire node never comes free, a parallel job will never run. How do I set up 
> scheduling policy to suspend scheduling serial jobs until higher-priority 
> parallel jobs are scheduled?

You will need slot reservation for the parallel job. Mainly as a starting point:

$ qconf -ssconf
...
max_reservation                   20
default_duration                  8760:00:00

and submit the parallel jobs with "-R y". The best would be to supply all jobs 
(serial and parallel) with a sensible expected run time by "-l h_rt=…". This 
will both reserve slots for the large parallel job (which may reserve some 
slots which keep them idle until enough slots are collected) and backfilling, 
which will still allow serial (or smaller parallel jobs) to start on idle 
reserved cores if it's known for sure, that they will finish before the last 
necessary slot for the parallel job becomes free.

- -- Reuti

http://gridengine.org/pipermail/users/2012-July/004090.html
-----BEGIN PGP SIGNATURE-----
Comment: GPGTools - https://gpgtools.org

iEYEARECAAYFAlm5mJ0ACgkQo/GbGkBRnRoGhQCeMU0RBHIVWLdeNddKse2sw/jd
RNQAnj7PXXealFk0DYpmv53rca2MFqAM
=5awF
-----END PGP SIGNATURE-----
_______________________________________________
SGE-discuss mailing list
SGE-discuss@liv.ac.uk
https://arc.liv.ac.uk/mailman/listinfo/sge-discuss

Reply via email to