> > The patching scenario is as follows:
> >
> > The product 1.0 is released.
> >
> > The patch 1.01.msp is released and built against 1.0.
> >
> > Another patch is needed, 1.02.msp. This patch is built against 1.0 so it
> > would include all of the changes since the original release. (The plan i
Jon Week wrote:
> The patching scenario is as follows:
>
> The product 1.0 is released.
>
> The patch 1.01.msp is released and built against 1.0.
>
> Another patch is needed, 1.02.msp. This patch is built against 1.0 so it
> would include all of the changes since the original release. (The plan
After searching through the email archives, I have yet to find any solution
to similar patching questions that have been asked multiple times.
The patching scenario is as follows:
The product 1.0 is released.
The patch 1.01.msp is released and built against 1.0.
Another patch is needed, 1.02.m