Hi,
there was an attempt at this some time ago, but the patch was never
merged and the infra has changed a lot in meanwhile so I don't think
it's worth it to rebase it. The patch was to run every existing test in
both single and multi worker scenarios.
You could probably extend the concept of ext
I can see that we can create pg- interface for unit testing various vpp
features.
Is it possible to test multiple workers? How can I make sure the packets will
be sent to different workers on a pg- interface?
-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.
View/Reply