does anymone think of an April fool's day???
**
Anthony THEVENIN
Research Engineer
PALM project
Global Change And Climate Modelling team
CERFACS
42, Avenue G. Coriolis
31057 Toulouse (FRANCE)
Tel: +33(0)561 19 30 73
Fax: +33(0)561 19 30 00
http://www.cerfacs.fr/
d for processor attention.
Hope that helps
Ralph
On Jan 27, 2009, at 7:59 AM, Anthony Thevenin wrote:
Hello,
I have two C codes :
- master.c : spawns a slave
- slave.c : spwaned by the master
If the spawn is include in a do-loop, I can do only 123 spawns before
having the folowing errors:
Hello,
I have two C codes :
- master.c : spawns a slave
- slave.c : spwaned by the master
If the spawn is include in a do-loop, I can do only 123 spawns before having
the folowing errors:
ORTE_ERROR_LOG: The system limit on number of pipes a process can open was
reached in file base/iof