I'm having this problem in an automated nightly build of a Natty Live
Disc
Setting up irqbalance (0.56-1ubuntu3) ...
/etc/init.d/irqbalance: 85: start: not found
invoke-rc.d: initscript irqbalance, action "start" failed.
dpkg: error processing irqbalance (--configure):
subprocess installed post-
This should be fixed for maverick.
** Changed in: irqbalance (Ubuntu)
Status: In Progress => Fix Released
--
Not stoppable/restartable via initctl
https://bugs.launchpad.net/bugs/580674
You received this bug notification because you are a member of Ubuntu
Server Team, which is subscribed
** Changed in: irqbalance (Ubuntu)
Assignee: (unassigned) => Chuck Short (zulcss)
--
Not stoppable/restartable via initctl
https://bugs.launchpad.net/bugs/580674
You received this bug notification because you are a member of Ubuntu
Server Team, which is subscribed to irqbalance in ubuntu.
-
Reopened. The patch does not completely solve the problem:
The pid file doesn't get removed when irqbalance shuts down (missing
capabilities?) and the next start fails because of
open(...O_CREAT|O_EXCL...).
# sudo start irqbalance
irqbalance start/running, process 1347
# cat /var/run/irqbalance
** Changed in: irqbalance (Ubuntu)
Status: Fix Released => In Progress
--
Not stoppable/restartable via initctl
https://bugs.launchpad.net/bugs/580674
You received this bug notification because you are a member of Ubuntu
Server Team, which is subscribed to irqbalance in ubuntu.
--
Ubuntu
This bug was fixed in the package irqbalance - 0.55+20091017-3ubuntu3
---
irqbalance (0.55+20091017-3ubuntu3) maverick; urgency=low
* debian/patches/do-irqbalance-pid.patch: Upstart needs a pid so it can shut
down.
(LP: #580674)
* debian/irqbalance.upstart: Update upstart scr
Thanks for the bug report Ill have a look at this.
chuck
** Changed in: irqbalance (Ubuntu)
Importance: Undecided => Medium
** Changed in: irqbalance (Ubuntu)
Status: New => Confirmed
--
Not stoppable/restartable via initctl
https://bugs.launchpad.net/bugs/580674
You received this bu