The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. shim — Live image made with BOOTX64.EFI from latest shim-x64-15.6-2
fails to boot on some boards — NEW
ACTION: kernel upstream to merge NX support
Proposed blockers
The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. kernel — anaconda failed to detect the fcoe target(only affects ixgbe) — NEW
ACTION: Maintainers to diagnose issue
NEEDINFO: lnie
2. plasma-workspace — Logging out
The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. crypto-policies — Insecure installed RPMs (like Google Chrome)
prevent system updates in F38, can't be removed — ASSIGNED
ACTION: Maintainers to propose solution for
The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. fcoe-utils — anaconda failed to detect the fcoe target(only affects
ixgbe) — NEW
ACTION: Maintainer to diagnose issue
NEEDINFO: cleech
2. gnome-calendar — After a f
F38 Beta is go, so it's time to look at final blockers. The current
target is the early target date (18 April).
Action summary
Accepted blockers
-
1. fcoe-utils — anaconda failed to detect the fcoe target(only affects
ixgbe) — NEW
ACTION: Maintainer to diagn
The current target release date is the early target date (2023-03-14).
The Go/No-Go meeting will be Thursday!
Action summary
Accepted blockers
-
1. distribution — Workstation boot x86_64 image exceeds maximum size — POST
ACTION: gdb maintainers to remove the
The current target release date is the early target date (2023-03-14).
Action summary
Accepted blockers
-
1. distribution — Workstation boot x86_64 image exceeds maximum size — ASSIGNED
ACTION: Workstation WG to reduce image size or increase the limit
2. kwi
On Fri, 2023-02-17 at 14:45 -0500, Ben Cotton wrote:
> The F38 Beta freeze begins on 21 February. The current target release
> date is the early target date (2023-03-14).
>
> Action summary
>
>
> Accepted blockers
> -
>
> 1. distribution — Workstation boot x8
The F38 Beta freeze begins on 21 February. The current target release
date is the early target date (2023-03-14).
Action summary
Accepted blockers
-
1. distribution — Workstation boot x86_64 image exceeds maximum size — ASSIGNED
ACTION: Workstation WG to redu
On Fri, Feb 10, 2023 at 5:52 PM Adam Williamson wrote:
>
> On Fri, 2023-02-10 at 08:47 -0500, Ben Cotton wrote:
> >
> > Accepted blockers
> > -
> >
> > 1–3. distribution — {Workstation,Everything,Server} boot x86_64 image
> > exceeds maximum size — ASSIGNED
> > ACTION: Relevant Tea
On Fri, 2023-02-10 at 08:47 -0500, Ben Cotton wrote:
>
> Accepted blockers
> -
>
> 1–3. distribution — {Workstation,Everything,Server} boot x86_64 image
> exceeds maximum size — ASSIGNED
> ACTION: Relevant Teams to reduce image size or increase the limit
>
> Accepted blockers
> -
We've branched F38 from Rawhide, so it's time to start everyone's
favorite Friday email from Ben! The F38 Beta freeze begins on 21
February. The current target release date is the early target date
(2023-03-14).
Action summary
Accepted blockers
-
1–3. distri
12 matches
Mail list logo