Durai Arasan writes:
> Is there a way of improving this situation? E.g. by not blocking IDLE nodes
> with jobs that only use a fraction of the 8 GPUs? Why are single GPU jobs
> not scheduled to fill already MIXED nodes before using IDLE ones?
>
> What parameters/configuration need to be adjusted
Hi,
Frequently all of our GPU nodes (8xGPU each) are in MIXED state and there
is no IDLE node. Some jobs require a complete node (all 8 GPUs) and such
jobs therefore have to wait really long before they can run.
Is there a way of improving this situation? E.g. by not blocking IDLE nodes
with jobs