On 5/11/21 4:47 am, Diego Zuccato wrote:
How can Slurm detect such an old HWLOC version?
Looking at the code it's not actually checking the hwloc version, it's
finding an error condition and suggesting that may be the cause, but it
sounds like it's not for you.
src/plugins/task/cgroup/task
On 9/11/21 5:42 am, Loris Bennett wrote:
We just set up a reservation at a point at a time which is further in the
future than our maximum run-time. There is then no need to drain
anything. Short running jobs can still run right up to the reservation.
This is the same technique we use too, w
Hi Ahmed,
Ahmad Khalifa writes:
> If I plan maintenance on a certain day, how long before that day
> should I set the queue to drain mode?! Is there a way to estimate the
> completion date / time of current running jobs?!
We just set up a reservation at a point at a time which is further in the
On 11/9/21 13:55, Marcus Wagner wrote:
I have written a script, which loops through all runnning jobs to tell me,
when a job ends on a specific node. This can be also done for all nodes.
The output would be for the longest job e.g.:
ncm0430 -> 2021-12-04T15:48:35
Nonetheless, we
I have written a script, which loops through all runnning jobs to tell me, when
a job ends on a specific node. This can be also done for all nodes. The output
would be for the longest job e.g.:
ncm0430 -> 2021-12-04T15:48:35
Nonetheless, we also plan maintenances with reservations