Re: [slurm-users] Wrong hwloc detected?

2021-11-09 Thread Chris Samuel
On 5/11/21 4:47 am, Diego Zuccato wrote: How can Slurm detect such an old HWLOC version? Looking at the code it's not actually checking the hwloc version, it's finding an error condition and suggesting that may be the cause, but it sounds like it's not for you. src/plugins/task/cgroup/task

Re: [slurm-users] How to get an estimate of job completion for planned maintenance?

2021-11-09 Thread Chris Samuel
On 9/11/21 5:42 am, Loris Bennett wrote: We just set up a reservation at a point at a time which is further in the future than our maximum run-time. There is then no need to drain anything. Short running jobs can still run right up to the reservation. This is the same technique we use too, w

Re: [slurm-users] How to get an estimate of job completion for planned maintenance?

2021-11-09 Thread Loris Bennett
Hi Ahmed, Ahmad Khalifa writes: > If I plan maintenance on a certain day, how long before that day > should I set the queue to drain mode?! Is there a way to estimate the > completion date / time of current running jobs?! We just set up a reservation at a point at a time which is further in the

Re: [slurm-users] How to get an estimate of job completion for planned maintenance?

2021-11-09 Thread Ole Holm Nielsen
On 11/9/21 13:55, Marcus Wagner wrote: I have written a script, which loops through all runnning jobs to tell me, when a job ends on a specific node. This can be also done for all nodes. The output would be for the longest job e.g.: ncm0430  -> 2021-12-04T15:48:35 Nonetheless, we

Re: [slurm-users] How to get an estimate of job completion for planned maintenance?

2021-11-09 Thread Marcus Wagner
I have written a script, which loops through all runnning jobs to tell me, when a job ends on a specific node. This can be also done for all nodes. The output would be for the longest job e.g.: ncm0430 -> 2021-12-04T15:48:35 Nonetheless, we also plan maintenances with reservations