nd 3-pole breakers but everything is pretty much 1-phase I believe. I'm
wondering if I should consider reconfiguring the system with 1-Ph inverters
tied in to only 2 of the utility legs. I asked SolarEdge weeks ago but
getting nothing from them. Any thoughts? Thanks!
Eric Stikes
SunHarvest Sola
As many of you may know, the PV industry is beginning to experience a
massive solid waste problem. According to my sources, as well as sources
such as the California DTSC, the CA PUC, NREL, and the U.S. EIA, the U.S.
is and/or will soon be experiencing a waste stream of around 15 million
modules go
conditions of the system.
I've adjusted the Bulk set point on the CC but that doesn't seem to make a
difference.
I doubt this is part of the problem but the generator is problematic as
well (it has it's own array of maladies).
Any insight is greatly appreciated. Thanks!
--
Eric St
3 matches
Mail list logo