I have a different question about wiring between arrays.
Ground mount, 2 arrays, all behind a fence for cow protection.
My question is, can you run EMT above ground on say 4” concrete blocks( like on
a roof) between the back array and the inverter which is at the front array?
Say 20’ between
*> My question is, can you run EMT above ground on say 4” concrete blocks(
like on a roof) between the back array and the inverter which is at the
front array?*
I have found in follow up inspections at a site where we did this that the
concrete blocks tend to move around a bit over time (presumabl
2 matches
Mail list logo