Greetings Jerry,
I believe I remember reading some Trus Joist technical documentation
which indicated no more than one hole should be drilled or lag
screw/bolt driven into any cross sectional area of the top flange. If
using the Quick Mount Q-Base with two lag screws/bolts, will you be
orienting
OK all,
I have a question about their tile roofs.
Anyone know if they are set up for module level shut down?
Or anybody have any anything about them?
And I heard that they are advertising for installers, ie they are starting a
new not Solar city install company?
Comments?
thx
jay
__
Jay; all I know is that a few of my recently graduated students who are
already Solar City employee PV installers have been training in California
for solar roof installs.
Tesla is notoriously tight-lipped about anything, like product
specifications, temperature coefficients, anything that would he
Matt,
I was not aware that one shouldn't place the lags directly across from each
other. Thanks for the advice.
Jerry Caldwell
On Wednesday, March 7, 2018, 6:44:12 AM PST, Lorenzo Ortiz
wrote:
It is possible according to Weyerhaeuser.
On Wed, Mar 7, 2018 at 12:50 AM, Matthew Sirum
HI All,
I’ve got someone asking me about powering a UPS model
Liebert GXT4 UPS
its a rack mounted unit.
And I cannot find any power usage data on it.
Would anyone maybe be able to hazard a guess or know a similar product that
might have some numbers?
And as I”m not familiar with this kind
Mac,
A company called Luminous Renewable Energy Solutions Pvt. Ltd. had taken over
the SWWP line. My last email with them was in 2013. I notice that their website
is not up but perhaps they sold or changed something.
http://www.luminousrenewable.com/
email r...@luminousrenewable.com
Larry C
It's 10KVA, what else do you need to know?
On Wed, Mar 7, 2018 at 2:26 PM, jay wrote:
> HI All,
>
> I’ve got someone asking me about powering a UPS model
>
> Liebert GXT4 UPS
>
> its a rack mounted unit.
>
> And I cannot find any power usage data on it.
>
> Would anyone maybe be able to hazard a
Primus Wind Power took over the Air X line, but they aren't doing the
Whisper equipment.
Ray
Remote Solar
On 3/7/18 1:06 PM, Starlight Solar Power Systems wrote:
Mac,
A company called Luminous Renewable Energy Solutions Pvt. Ltd. had taken over
the SWWP line. My last email with them was in
Hi Mac I have had a similar experience. But I am not saying the same. The
turbine has a nacelle that splits to furl. When we took down to repair the
pivot pin hole in the case was so worn it needed to be re-bored and fitted
with a bushing. I could not find a machine shop to do it because the
Na
I ordered parts for our 1kW on campus a couple years ago. It was a hassle. I’ll
check my records and send the company info. I can’t remember the name off the
top of my head.
Jesse Dahl
NABCEP PV Installation Professional
IBEW Local 292 - Electrician
Electrical/Solar PV Instructor - HCC
Sent
Hi all Jesse I have seen your system, and it is a Bergy 1 kW. Mac has got
a Southwest wind power unit. Unless you have a SWWP also that I have not
seen?
On Wed, Mar 7, 2018 at 6:36 PM, Solar wrote:
> I ordered parts for our 1kW on campus a couple years ago. It was a hassle.
> I’ll check my rec
Hi Jay I have not worked on that unit, but I have worked on some other
units. This a double conversion unit, it has double conversion, and I
think you are talking of the 3000 VA unit. It has both a AC to Battery
conversion and a Battery to AC conversion. So it has an efficiency and
tare losses.