Ben,
There is a way if the ledge is solid and true. Twice I have done the following
with ledge at 18” to 24” below grade. Excavate down to ledge, drill down into
the ledge and you will determine the suitability of the following method. Drill
for a pattern of many rebar penetrations in to the le
ider the environment before printing this email.
From: RE-wrenches On Behalf Of Ray
Sent: Wednesday, June 23, 2021 5:39 PM
To: re-wrenches@lists.re-wrenches.org
Subject: Re: [RE-wrenches] Top of Pole Mount Array on Ledge
If you can get anchor bolts in, you can weld on a 1" think p
If you can get anchor bolts in, you can weld on a 1" think plate with
gussets to the bottom of the pole. We've had to do this a couple of
times in rock. We'll pour enough concrete to get a level base, but the
bolts are epoxied into holes in the rock. A good epoxy anchor is
stronger than the b
A pole mount can be part of a virtually tracked array system. Gives long
hours of power, if that is the reason she wants this. It can be angled for
SW 9 months and go south for the winter. It needs another array or combo of
arrays for SE and S. If it is some other weird reason she wants this, I
w
Hi Wrenches,
We typically use SunModo ground mounts with ground screws which we can put
just about anywhere as our screw guy has a rock drill.
We have one customer who is dead set on a top of pole mount array and will
not settle for a typical ground mount with multiple posts.
There is shallow ledg