Max,
Don't do the tap alone, you would be overdriving the subpanel. You would
need 200A of OCP somewhere between the tap and sub panel loads. Convert
the MOL to a 200A Main Breaker or install a 200A fused disconnect
between the tap and the MLO subpanel.
Mark Frye
Berkeley Solar Electric Syst
Fellow wrenches, I've got an install that is a little different than any I've
done before. We are going to put an 18 Kw groundmount on the side of a hill
(nothing new so far).
The Array will be about 150 feet from a 200 amp MLO subpanel in the garage of a
guest house. Still nothing new. The sub
2 matches
Mail list logo