Re: [RE-wrenches] 3-phase with storage

2018-05-18 Thread Jamie Rennie
ven reliability. > > > > Kevin > > > > From: RE-wrenches [mailto:re-wrenches-boun...@lists.re-wrenches.org] On > > Behalf Of Marco Mangelsdorf > > Sent: April-17-18 10:48 AM > > To: RE-wrenches > > Subject: [RE-wrenches] 3-phase with storage > &

Re: [RE-wrenches] 3-phase with storage

2018-04-18 Thread Dave Angelini Offgrid Solar
nches-boun...@lists.re-wrenches.org] On > Behalf Of Marco Mangelsdorf > Sent: April-17-18 10:48 AM > To: RE-wrenches > Subject: [RE-wrenches] 3-phase with storage > > Aloha all. > I'm on the hunt for workable options for a PV plus storage design for a > 3-phase 12

Re: [RE-wrenches] 3-phase with storage

2018-04-17 Thread Darryl Thayer
I have done it, not hard but limited to 32 kw for backup power, 120/208 3 phaze using Outback FXR On Tue, Apr 17, 2018, 1:19 PM Marco Mangelsdorf wrote: > Aloha all. > > I'm on the hunt for workable options for a PV plus storage design for a > 3-phase 120/208 application. > > And there ain't muc

Re: [RE-wrenches] 3-phase with storage

2018-04-17 Thread Kevin Pegg
lto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of Marco Mangelsdorf Sent: April-17-18 10:48 AM To: RE-wrenches Subject: [RE-wrenches] 3-phase with storage Aloha all. I'm on the hunt for workable options for a PV plus storage design for a 3-phase 120/208 application. And ther

Re: [RE-wrenches] 3-phase with storage

2018-04-17 Thread Dave Angelini Offgrid Solar
I do not want to sound like I am plugging Discover AES batteries and there use with Schneider and soon Outback. There web page has a 3 phase XW+ system on it and all the coms built in to the BMS to work with Xanbus. AEE had a webinar also last week. It is on their U-tube channel. Dave Angelini Off

Re: [RE-wrenches] 3-phase with storage

2018-04-17 Thread Jerry Shafer
Marco Outback R is available we got batteries too, we ccn talk off list if you like, im on island too Jerry On Tue, Apr 17, 2018, 8:19 AM Marco Mangelsdorf wrote: > Aloha all. > > I'm on the hunt for workable options for a PV plus storage design for a > 3-phase 120/208 application. > > And there

Re: [RE-wrenches] 3-phase with storage

2018-04-17 Thread Will White
SMA Sunny Island, Outback, and Schneider can all be configured for three phase systems. On Tue, Apr 17, 2018 at 1:47 PM, Marco Mangelsdorf wrote: > Aloha all. > > I'm on the hunt for workable options for a PV plus storage design for a > 3-phase 120/208 application. > > And there ain't much out t

[RE-wrenches] 3-phase with storage

2018-04-17 Thread Marco Mangelsdorf
Aloha all. I'm on the hunt for workable options for a PV plus storage design for a 3-phase 120/208 application. And there ain't much out there at present. Any suggestions would be appreciated. mahalo, marco ___ List sponsored by Redwood Alliance List