Dear Wrenches,
I am preparing to install a flush mount roof top solar PV system on a
friends home in North Central Massachusetts. The local building department
would like a stamped letter from a MA engineer certifying that the roof
structure can support the additional load of the PV system. I ha
Hello Hard Working Wrenches,
I am working on a residential grid tied PV system design for a friend in
Massachusetts. He would like a DAS that reports automatically to the
Mass-CEC. Does anyone have a suggestion for a reliable DAS solution?
Thank you,
Jibril
Tava Solar LLC
jib...@tavasolar.com
Hello again Solar Folk,
I just heard back from SMA tech support. Not possible. With no
communication between inverters there is not way to sync the sine waves and
keep it all "pretty." Alas. . .
Thanks again,
Djibril
On Mon, Jul 29, 2013 at 3:44 PM, James Gustafson wrote:
>
Hello Solar Folk,
I'm wondering if it is possible combine the secure power source outputs of
two SMA SBTL-22's in series to run a 240v load, like a small well pump.
Does anyone have any ideas about the feasibility of this concept?
Thank You Much,
Djibril
On Mon, Jul 22, 2013 at 5:46 AM, Carl Ad
4 matches
Mail list logo