Crimp on "C" clamps meet code, but sometimes are not that secure of a
connection.
_Drake Chamberlin_
_Athens Electric LLC_
_Ohio Electrical Contractor's License 44810_
_NABCEP Certified PV Installation Professional_
---
On 2025-02-20 12:01, Kristopher Schmid via RE-wrenches wrote:
Than
Hello, this is from an old guy. In the 1960s, our project found that
hydrogen tended to migrate through electrolyzing and could put hydrogen
into an oxygen tank. Energy is involved in pressuring the hydrogen. All
piping has to be more than 5% chrome to prevent hydrogen embrittlement. The
Gibbs fun
All,
www.encap.energy - batteries
www.enapter.com - H2 components
Any thoughts on capacitive storage, and specifically Encap capacitive
batteries with H2?
I have a customer with his heart set on using these batteries etc.for a
major RE system expansion. Already using an Enapter sourced electro
This is a PSA for Enphase installers. There is a known issue with new
systems that have a mix of two firmwares out of the box. The last few
systems we have installed had microinverters from different batches with
the below two firmwares. It causes all of the r06 microinverters to
intermittently sto
If you go back and look at the stock price, Enphase was just about to go
bankrupt in the 2017 period. They had just released their IQ micros which
were quite reliable but were riddled by a bad reputation from prior
generations with high failures, particularly M190/M210s. We were one of
those compan
Around here, AHJs require that the GEC is not connected to the service
disconnect or any supply-side interconnected PV AC disconnect. They require
a GEC from the meter socket enclosure to the GE system with a N-G bond in
the meter enclosure (the N and G lugs are one and the same typically anyway
in
I made a decision to go w Enphase when Solar Edge was a viable
competitor. I did not like some aspects of Solar Edge, and I am glad I
went with Enphase. I only install on this small island, 22 systems
starting with M250's. Average project is 16 modules. I have had only
one microinverter failu
Thanks Cory,
I think that the supply side connection may require the irreversible splice
since it is considered a service entrance. In some cases, the GE is not
easily accessible (under concrete for example) to add a GEC to the GE
directly. In any case, my AHJs do not like the split bolt connect