On Mon, Nov 25, 2019, 10:52 PM Bill Hennessy wrote:
> hi folks--
>
> We're insta
hi folks--
We're installing a grid-tied, battery backup system on a farm where the service
entrance is on a pole in the yard. At the single-phase, 240v, service entrance,
there are two main breaker subpanels--one going to the house and one to the
barn. The buildings are each about 100 feet away
And with all Enphase adapters, don't forget to check for continuity and
connector seating before assembling. On occasion, we've found opens in the
adapters.
bill
Bill Hennessy
Berks Solar, LLC
371 Centennial Rd
Mertztown, PA 19539
o 610 682 4300
c 484 560 4666
NABCEP certified installer
PA cont
Hi Jay,
Ran into the exact situation last install season with Enphase. After a lot
of back and forth emails with pictures basically showing them I wasn't
losing it, they finally deduced that they were packaging them wrong. So the
package part number is correct but the adaptor inside the package is