Hi Group,
I have quite a collection of VFX and GVFX inverters with board
problems. I am trying to get a few working by cannibalizing others. To my
knowledge some boards are DC Voltage specific (ie FET Board), Ac Board is
common on all FX series, control board is voltage and grid vs off-gri
Jerry,
Why do you have to meet rapid shutdown on an existing installation please?
Down here in the central Sierra we have been uninsurable for fire really
since we built the home. Many of my clients self-insure offgrid. We do the
best we can for installation and fire hardening and then just cross
I tried to design a system with TS4-Os and an Outback CC. They were not
compatible at that time (about a year ago) due to conflict between
optimizer function and Outback MPPT. The system would get stuck off MPPT.
I assume that is still the case but cannot confirm. Tigo support kept
saying they
Wrenches
Regarding the RSD both here and coming soon to a town near you, I found
that the Tigo TS4-R-S is completely compliant for the OutBack system
including module level monitoring, however the F model also from Tigo is
not at all. I attempted to contact other manufactures but had no success,
if
4 matches
Mail list logo