Re: [RE-wrenches] Off grid DC Loads: DC Converter

2018-01-17 Thread frenergy
Dave,             Next to the invoice for the cost of the battery (and new cables and labor and freight of course), post a large envelope next to it:  "NEXT BATTERY SAVINGS ACCOUNT, If you don't pay attention and ruin your battery in 2 years, insert $35/week.  If you care for your battery lik

Re: [RE-wrenches] Off grid DC Loads: DC Converter

2018-01-17 Thread Dave Angelini Offgrid Solar
Or just design extra loading in. Tell them they have this much wiggle room and after that, it is the next size in battery and more solar. People always use more after a year or so. I also have the client post a copy of the cost for the battery on the wall near the system. Good Luck! Dave Angelini

Re: [RE-wrenches] Off grid DC Loads: DC Converter

2018-01-17 Thread Dana
Do an Energy Load Evaluation, it commits the client to participation in a personal way. I will not design without one. Dana Orzel Great Solar Works, Inc. 208.721.7003 d...@so