Re: [RE-wrenches] Generator and Enphase

2011-03-28 Thread Ken Schaal
Larry and Kent We did an XW system several months ago, feeding a dedicated loads panel of course. The owner wanted to fill out the roof space so we added 9 modules w/ 190 W Enphase connected to the main panel. My understanding is that when the grid goes down, the Enphase goes off line, and the

[RE-wrenches] Used MX60

2011-03-28 Thread William Miller
Friends: Years ago Outback gave me a rebuilt MX60 in exchange for some warranty work. It has been handy to have this device but I needed to part with it recently. Does anyone have a used or rebuilt MX60 they'd like to sell? Contact me off list. Thanks, William William Miller Miller Sol

[RE-wrenches] Fw: Generator and Enphase

2011-03-28 Thread Ken Schaal
Larry and Kent We did an XW system several months ago, feeding a dedicated loads panel of course. The owner wanted to fill out the roof space so we added 9 modules w/ 190 W Enphase connected to the main panel. My understanding is that when the grid goes down, the Enphase goes off line, and the