Hi Kirk,
See 2008 NEC 225.30 thru 225.40. As I understand it, separate disconnects,
up to six for each array, located on the main building, are required and
appropriate.
Dick Ratico
Solarwind Electric
--- You wrote:
Hello,
I'm working on a system which will have 5 kw on an outbuilding and 20k