This article in the Cape Cod paper floored me, especially with this quote
"It's really not a big deal," said CEO Barry Cinnamon. "The most dangerous
thing is learning about ladder safety."
http://www.capecodonline.com/apps/pbcs.dll/article?AID=/
There continues to be a consistent drum beat for Energy Efficiency both as a
complement to renewable energy projects and as an economic stimulus ("Cash
for Caulkers"). I heartily support the former but I am skeptical of the
latter. I add in note that Energy Efficiency projects will qualify for most
HI Yes you are correct, a panel will lose less than they collect. BUT the Frul
will tell you the amount of loss you could expect. If no one calculates I will
do it early next week.
Darryl
--- On Fri, 12/18/09, Carl Emerson wrote:
> From: Carl Emerson
> Subject: Re: [RE-wrenches] solar ho
about ladder safety."
http://www.capecodonline.com/apps/pbcs.dll/article?AID=/20091219/NEWS11/9121
09992
http://www.capecodonline.com/apps/pbcs.dll/article?AID=/20091219/NEWS11/9121
09992>
My gut says this will spawn a whole host of horror story installations.
Tom
_
If there's a -1 at the end of the Fronius model, it's split phase output
with two hot output terminals. IG Plus 11.4-1 for instance. If there's a -3
at the end, it's a true 3-phase unit with three hot output terminals. IG
Plus 11.4-3 for instance.
And Carl is correct, the larger Fronius units,
This article in the Cape Cod paper floored me, especially with this quote "It's
really not a big deal," said CEO Barry Cinnamon. "The most dangerous thing is
learning about ladder safety."
http://www.capecodonline.com/apps/pbcs.dll/article?AID=/20091219/NEWS11/9121099
Brian:
It seems to me that this requires the PE to actually commission the
system. A simple wet-stamp on plan submittals is not even indicated by the
paragraph below, but I am certain is required.
Bill, have you had to have a PE provide a commissioning report at the time
of final inspect
Yes, Yorba Linda technically requires an electrical PE stamp on PV
projects.
We've probably done a dozen installations in the city, though I
don't think they've
enforced the electrical PE requirement on all projects. They do
require structural
PE on all projects as well, and that requireme