Re: [HACKERS] LAST CALL FOR 9.1

2011-01-15 Thread Josh Berkus
On 1/15/11 6:50 AM, Robert Haas wrote: > It is really already too late for us to be seriously considering > integrating sync rep into 9.1. It will lead to another enormous beta > period during which the tree will be closed to new patches and > everyone will complain, or else we'll open the tree fo

Re: [HACKERS] LAST CALL FOR 9.1

2011-01-15 Thread Robert Haas
On Sat, Jan 15, 2011 at 1:59 PM, David E. Wheeler wrote: > On Jan 15, 2011, at 6:50 AM, Robert Haas wrote: >>> It is really already too late for us to be seriously considering >> integrating sync rep into 9.1.  It will lead to another enormous beta >> period during which the tree will be closed to

Re: [HACKERS] LAST CALL FOR 9.1

2011-01-15 Thread David E. Wheeler
On Jan 15, 2011, at 6:50 AM, Robert Haas wrote: > It is really already too late for us to be seriously considering > integrating sync rep into 9.1. It will lead to another enormous beta > period during which the tree will be closed to new patches and > everyone will complain, or else we'll open t