On Fri, 4 Jan 2019, Jeremy Finzel wrote:
Another suggestion which hasn’t been mentioned is using ‘infinity’ as the
end date. I like this because it IMO indicates that the record is clearly
the current valid record more than null.
Jeremy,
I believe that infinity was mentioned in this thread.
On Fri, Jan 4, 2019 at 4:19 PM Rich Shepard
wrote:
> On Fri, 4 Jan 2019, David G. Johnston wrote:
>
> > That would be the decision to make - does your toolkit support (or can be
> > made to support) the type and are you willing to choose a sub-optimal
> > database model because one or more applic
On Fri, 4 Jan 2019, David G. Johnston wrote:
That would be the decision to make - does your toolkit support (or can be
made to support) the type and are you willing to choose a sub-optimal
database model because one or more applications happen to do things
differently?
IMO the daterange datatyp
On Fri, Jan 4, 2019 at 2:21 PM Rich Shepard wrote:
>Thinking more about duration perhaps I'm seeing a problem that really does
> not exist: it's a single column for both dates in the table while the UI
> needs separate date data entry widgets. Unless I use middleware code when a
> project row
On Fri, 4 Jan 2019, Rich Shepard wrote:
Thank you. That's a data type I've not before used.
Andreas,
Thinking more about duration perhaps I'm seeing a problem that really does
not exist: it's a single column for both dates in the table while the UI
needs separate date data entry widgets. U
On Fri, 4 Jan 2019, Andreas Kretschmer wrote:
Only if all projects have a known end_date; some don't.
that's not a problem:
test=*# create table projects(duration daterange default
daterange(current_date,null) check(lower(duration) is not null));
Andreas,
Thank you. That's a data type
Am 04.01.19 um 18:32 schrieb Rich Shepard:
other solution for such 2 fields: you can use DATERANGE, only one field.
Only if all projects have a known end_date; some don't.
that's not a problem:
test=*# create table projects(duration daterange default
daterange(current_date,null) check(
On Fri, 4 Jan 2019, David G. Johnston wrote:
No. If no default is available and a value for the field is not provided
the stored value will be null; a default of null is thus also redundant
specification.
David,
Thanks for clarifying.
Regards,
Rich
On 1/4/19 10:26 AM, Rich Shepard wrote:
On Fri, 4 Jan 2019, Rob Sargent wrote:
Is the end_date always knowable at record insert?
Rob,
Not always. Sometimes projects have known end dates, other times the
end
is interminate until it happens.
CHECK(end_date is null or start_date <= end_
On Friday, January 4, 2019, Rich Shepard wrote:
> On Fri, 4 Jan 2019, David G. Johnston wrote:
>
> I wondered about this since NULL can be missing, unknown, or otherwise
>>> defined. Are there benefits to allowing an empty value in that column
>>> when
>>> checking that it's later than the star
On Fri, 4 Jan 2019, David G. Johnston wrote:
I wondered about this since NULL can be missing, unknown, or otherwise
defined. Are there benefits to allowing an empty value in that column when
checking that it's later than the start date rather than explicitly setting
a default date after the st
On Friday, January 4, 2019, Rich Shepard wrote:
> On Fri, 4 Jan 2019, David G. Johnston wrote:
>
> The is null expression is redundant since check constraints pass when the
>> result is unknown.
>>
>
> David,
>
> I wondered about this since NULL can be missing, unknown, or otherwise
> defined.
On Fri, 4 Jan 2019, Andreas Kretschmer wrote:
no, you can use NULL, for instance. You don't need an explicit value.
But maybe you want to set the start_date to NOT NULL.
Andreas,
Yes, I added NOT NULL to the start_date column.
2. If so, please suggest a value for it.
other solution for
On Fri, 4 Jan 2019, David G. Johnston wrote:
The is null expression is redundant since check constraints pass when the
result is unknown.
David,
I wondered about this since NULL can be missing, unknown, or otherwise
defined. Are there benefits to allowing an empty value in that column when
On Fri, 4 Jan 2019, Rob Sargent wrote:
Is the end_date always knowable at record insert?
Rob,
Not always. Sometimes projects have known end dates, other times the end
is interminate until it happens.
CHECK(end_date is null or start_date <= end_date)
So a default of NULL should be appl
On Friday, January 4, 2019, Rob Sargent wrote:
>
> CHECK(end_date is null or start_date <= end_date)
>
The is null expression is redundant since check constraints pass when the
result is unknown.
David J.
On Fri, 4 Jan 2019, Igor Korot wrote:
1. Do I need a DEFAULT value for the end_date?
2. If so, please suggest a value for it.
start_date.day() + 1?
Thanks, Igor. I did not pick up this syntax when I looked at data types
and their DDL usage.
Regards,
Rich
On 1/4/19 10:12 AM, Igor Korot wrote:
Hi, Rich,
On Fri, Jan 4, 2019 at 10:53 AM Rich Shepard wrote:
I have a projects table that includes these two columns:
start_date date DEFAULT CURRENT_DATE,
end_date date
CONSTRAINT valid_start_date
CHECK (start_date <= end_date),
Am 04.01.19 um 17:53 schrieb Rich Shepard:
I have a projects table that includes these two columns:
start_date date DEFAULT CURRENT_DATE,
end_date date
CONSTRAINT valid_start_date
CHECK (start_date <= end_date),
1. Do I need a DEFAULT value for the end_date?
no, you can use NULL,
Hi, Rich,
On Fri, Jan 4, 2019 at 10:53 AM Rich Shepard wrote:
>
>I have a projects table that includes these two columns:
>
> start_date date DEFAULT CURRENT_DATE,
> end_date date
> CONSTRAINT valid_start_date
> CHECK (start_date <= end_date),
>
>1. Do I need a DEFAULT val
20 matches
Mail list logo