The NANOG organization, and I personally, apologize for publishing the
incorrect dates for NANOG 72 on our website and in the closing slides of
NANOG 69 and NANOG 70.
NANOG 72 was originally slated to start the first week of February, 2018.
This changed in December 2016 for reasons explained below
The AS701 BGP routes have been removed. Thanks.
On Thu, Nov 16, 2017, at 02:34 PM, Clinton Work wrote:
> Can a Verizon AS701 contact me to discuss why you are advertising BGP
> routes for the following TELUS AS852 address space. I tried to open a
> ticket with your IP NOC, but you won't open a
Can a Verizon AS701 contact me to discuss why you are advertising BGP
routes for the following TELUS AS852 address space. I tried to open a
ticket with your IP NOC, but you won't open a ticket for a non-customer.
207.34.206.0/24
207.34.222.0/24
207.34.250.0/24
207.34.251.0/24
Ken,
Thanks for the in depth response. My biggest problem is that the DC gave us
cabinets on the smaller side which makes them almost impossible to work
with. If I was building out fresh I would prob get a cage and build out
with big cabs but my boss isn't offering such luxuries.
On Mon, Nov
4 matches
Mail list logo