I think Dana is going to deliver the knock out punch when he flies his
assembled kit before many of us who have been building our KRs long before
he started assembling. Sometimes I wish I could put rivet A into hole B and
go flying, or is that rivet 7281 into hole 7282?
Jack Cooper
> [Original
Jack Cooper wrote:
> I think Dana is going to deliver the knock out punch when he flies his
> assembled kit before many of us who have been building our KRs long
> before he started assembling. Sometimes I wish I could put rivet A
> into hole B and go flying, or is that rivet 7281 into hole 7282?
>Am I the only one envisioning a flying erector set? ;)
>--
>Steve
Steve, after building a KR-2 it is somewhat different. I still remember
Langford's face when I clecoed together an entire flap in something like 2.5
minutes:-)
And Jack, I have looked for land with a large enough flat spot for
Dana Overall wrote:
>
> Steve, after building a KR-2 it is somewhat different. I still
> remember Langford's face when I clecoed together an entire flap in
> something like 2.5 minutes:-)
I was going to build an RV-4, until I remembered I suck at sheet metal. If
it's a flat piece I can generally
4 matches
Mail list logo