Steve one point that has not been brought up in the hinge thread is the
positioning of the actual pivot point. Dean CAD designed the Dr. Dean
elevator hinge using the existing spar height to achieve a pivot point that
would be centered as the elevator pivoted. This enables you a achieve a
muc
"Dana Overall" wrote:
> Rivets can be set
>using a backing plate, to accomodate the factory head,
>and a hammer. You don't need a squeezer or C-frame.
>
Dana Thanks for the pics. I belive you have helped me
make up the decision. To go with Rod ends for hinges and
a push rod in lue of cabl
2 matches
Mail list logo