Hey Phil
I am working on my HS at the moment as well.
This is the link to my construction page (which will be updated in the
coming week) which shows how I set up the rib and spars.
http://www.kiwikr.co.nz/221horistab2.html
And if you look at the seventh photo down in the page link below you wil
Hi guys.
I am about to finally sand the foam on my KR2SS H/S and elevator.
But considering a slight change and place weights on the elevator tips this
time and not internal as I did last time as per Mark Langford design.
Any photo's out there of the rib spar design on web pages etc, I can find
2 matches
Mail list logo