Re: controlling upstream/downstream relationships

2012-05-02 Thread Maven User
Anyone else? There should be someway to reset this

Re: controlling upstream/downstream relationships

2012-05-02 Thread Sami Tikka
AFAIK that information has never been written down anywhere. Instead it has always been inferred from the "Trigger other projects..." and "Build after other projects" settings of jobs. -- Sami 2012/5/2 Maven User : > Hi all - > > I could have sworn somewhere that a jenkins job stores what it thin

controlling upstream/downstream relationships

2012-05-02 Thread Maven User
Hi all - I could have sworn somewhere that a jenkins job stores what it thinks is an upstream or downstream job. I have two jobs that at one point, were misconfigured. Now one always triggers the other. Is there a way to clip this configuration? I could have sworn that in one of the files