On Tuesday, August 11, 2015 at 6:14:43 PM UTC-4, Gregory Symons wrote:
>
> The only thing I can think of for what's happening is that the change
> isn't getting recorded as having been built before the next polling cycle
> runs, because the top-level build hasn't finished.
>
Possible. I do not
I'm seeing something a little weird in one of my workflow jobs, and I'm not
sure if I'm doing something wrong or if it's a bug. Basically I have a top
level job that's coordinating several component jobs. The top level job
monitors several repos (right now it's just polling every 5 minutes) for