Re: Workflow Jobs and SCM Polling

2015-08-12 Thread Jesse Glick
On Tuesday, August 11, 2015 at 6:14:43 PM UTC-4, Gregory Symons wrote: > > The only thing I can think of for what's happening is that the change > isn't getting recorded as having been built before the next polling cycle > runs, because the top-level build hasn't finished. > Possible. I do not

Workflow Jobs and SCM Polling

2015-08-11 Thread Gregory Symons
I'm seeing something a little weird in one of my workflow jobs, and I'm not sure if I'm doing something wrong or if it's a bug. Basically I have a top level job that's coordinating several component jobs. The top level job monitors several repos (right now it's just polling every 5 minutes) for