Would this setup work for you?
Prepare triggers Smoke
Smoke triggers Desktop and pre_Install
pre_Install has the following post build actions:
*Build other projects:*
Projects to build = EFSW_x64_On_x86, EFSW_x86_On_x64
*Join Trigger*(from Join plugin)*:*
Projects to build once, after all downs
Hi,
I try to build a workflow with the new workflow-pluging.
Maybe I do something not in the right way, but the snippet here leads to a
situation which I don't understand:
Three of the builds (the Jobs are maven surefire junit tests) finish with
success (green/blue) and on with unstable (orang