On Thu, 2013-05-02 at 14:45 -0300, Paulo Zanoni wrote:
> Hi
>
> 2013/4/29 Imre Deak :
> > According to BSpec the link training sequence for eDP on HSW port-A
> > should be as follows:
> >
> > 1. link training: clock recovery
> > 2. link training: equalization
> > 3. link training: set idle transmi
Hi
2013/4/29 Imre Deak :
> According to BSpec the link training sequence for eDP on HSW port-A
> should be as follows:
>
> 1. link training: clock recovery
> 2. link training: equalization
> 3. link training: set idle transmission mode
> 4. display pipe enable
> 5. link training: disable (set norm
According to BSpec the link training sequence for eDP on HSW port-A
should be as follows:
1. link training: clock recovery
2. link training: equalization
3. link training: set idle transmission mode
4. display pipe enable
5. link training: disable (set normal mode)
Contrary to this at the moment