I don't see much of a reason to have the same JIRA listed under both 0.23
and 2.0. I can see some advantage of being able to see what went into
0.23.X by looking at a 2.0.X CHANGES.txt, but unless the two are released
at exactly the same time they will be out of date with each other in the
best ca
Along with fix versions, does it make sense to add JIRAs under 0.23 as well
as branch-2 in CHANGES.txt, if they're committed to both branches.
CHANGES.txt tends to get out of sync with the different release schedules
of the 2 branches.
Thanks
- Sid
On Sat, Sep 29, 2012 at 10:33 PM, Arun C Murthy
Guys,
A request - can everyone please set fix-version to both 2.* and 0.23.*? I
found some with only 0.23.*, makes generating release-notes very hard.
thanks,
Arun