Martin Rottensteiner writes:
> In my setup in org 9.4 the behaviour is like this for a scheduled date
> without scheduled time (for example SCHEDULED: <2020-10-27>:
> C-u S-left: Date changes to date before (26th)
> C-u S-right: Date does not change
> C-u C-u S-left: Date changes to date before (2
Hi list,
i often use shift with left or right arrow keys to change the date in
org-(super-)agenda. These key combinations can be used with prefix C-u and
double prefix C-u C-u.
In my setup in org 9.4 the behaviour is like this for a scheduled date
without scheduled time (for example SCHEDULED: <2